S Bahn Stuttgart News. Posted on 8th dec 2020 18:42. Under the agreement between 58 additional br 430 series trains will be delivered which will create a total 155 fleet of same series trains.
Alstom will retrofit the br423 and br430 trains with etcs level. The contract includes the provision of engineering services to redesign the 423 and 430 series fleets, along with the modernisation and delivery of three converted prototype vehicles per series and the material delivery for the. With this service, the three db companies ensure mobility in the capital of baden.
It’s Planned That By January 2025, The Retrofitted Trains Will Be Running On The First Lines Fitted With Etcs Level 2.
The client is db regio ag, which holds the operating contract until 2032. Alstom will retrofit the br423 and br430 trains with etcs level. With this service, the three db companies ensure mobility in the capital of baden.
Under The Agreement Between 58 Additional Br 430 Series Trains Will Be Delivered Which Will Create A Total 155 Fleet Of Same Series Trains.
Posted on 8th dec 2020 18:42. The contract includes the provision of engineering services to redesign the 423 and 430 series fleets, along with the modernisation and delivery of three converted prototype vehicles per series and the material delivery for the. With the interior elements of our redesign, we are meeting the latest requirements for urban mobility.
From Central Stuttgart, New Track Through The 9.4Km (5.8 Mile) Filder Tunnel Will Carry Rail Traffic To A New Station, Filderbahnhof.
It covers over 68 km and has 29 stops. This work is part of the stuttgart 21 project, a railway and urban development project. As part of the landmark rail project known as stuttgart 21, the contract will see alstom retrofit the br 423.
Bombardier Will Provide Engineering Services To Redesign The Trains And Modernise And Deliver.
Since the regionalization of the rail transport system is passed into the ownership role of the stuttgart region (vrs).